Skip to main content

v0.3

Minor Versionm

by Mike Bonness

    • Raise the Door to the fully Open position. This Unloads the Spring Loading.

    • Secure the Door Webbing to the Roll Tube with rope to hold it in place during this entire process.

  1. Roll Tube in Header Assembly
    • Roll Tube in Header Assembly

    • Counterbalance Assembly

    • Metal Washer

    • Spring Mounting Plate

    • Flanged Nuts (3)

    • Connecting Pin with Clip

    • Alignment Tab and Grooves

  2. If the Header Assembly is Installed in the Facility, the Door Roll Assembly will need to be held in place during the removal of the Counterbalance Assembly.
    • If the Header Assembly is Installed in the Facility, the Door Roll Assembly will need to be held in place during the removal of the Counterbalance Assembly.

    • Remove three Flanged nuts.

    • Slide the Counterbalance Assembly out of the roll tube.

Finish Line

One other person completed this guide.

Todd Lucas

Member since: 03/01/2022

13,056 Reputation

127 Guides authored

Team

Engineering Team Member of Engineering Team

3 Members

83 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 24