Skip to main content

v1.0

Major VersionM

Approved Installation Instruction Approval Process

by Mike Bonness

  1. Allow the Curtain to warm before Installation.
    • Allow the Curtain to warm before Installation.

    • Stand the Frame on edge or lay it on a flat surface with the flush side up.

    • Insert Screws

    • from the inside of the Frame

    • through the Curtain Grommets

    • Loosely secure the Curtain with a Flanged Nut.

  2. Align the Holes in the Screen Frame and the Caster Assembly.
    • Align the Holes in the Screen Frame and the Caster Assembly.

    • Align the Holes in the Screen Frame and the Caster Assembly.

    • Insert three Hex bolts from the Top/Inside.

    • Secure the Parts with Locknuts.

Finish Line

Todd Lucas

Member since: 03/01/2022

13,056 Reputation

127 Guides authored

Team

Engineering Team Member of Engineering Team

3 Members

83 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 1

Past 7 Days: 1

Past 30 Days: 1

All Time: 50