Skip to main content

v1.2

Minor Versionm

by Mike Bonness

  1. Use two (2) people, and two ladders (at minimum). Raise the Roll Header Assembly into place on the wall.
    • Use two (2) people, and two ladders (at minimum).

    • Raise the Roll Header Assembly into place on the wall.

    • The Bottom and Outside edges of the Header Bracket Mounting Flanges should fit inside of Marks on the Mounting Surface.

    • Transfer the (3) Slot locations, per side, onto the Mounting Surface.

    • Prepare the locations for Hardware appropriate to the building material.

    • Loosely secure with three (3) sets of mounting hardware per side.

    • Level the Header Assembly, and fully tighten all six sets of hardware.

    • At this point leave the Door/Web Roll tied off and held in place as it comes.

Finish Line

Todd Lucas

Member since: 03/01/2022

13,056 Reputation

127 Guides authored

Team

Engineering Team Member of Engineering Team

3 Members

83 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 70