Skip to main content

v1.0

Major VersionM

by Trent Borgardt

  1. Vinyl Critter Catchers Omitted from this step for Clarity.
    • Vinyl Critter Catchers Omitted from this step for Clarity.

    • Plumb the Tracks and Transfer All Mounting Hole locations onto the Mounting Surface.

    • There are 8 Track Brackets (4 per Track).

    • Swing the Tracks out of the way, and Prep these locations for Hardware Appropriate for the Building Material.

    • Pre-Drilling Holes in the Mounting Surface is Recommended.

    • Swing the Tracks back into place, Plumbing them once again, before finally, Fastening the Track Brackets to the Mounting Surface.

  2. The Vinyl Critter Catchers are installed in the Vertical Track prior to shipment. Once the Vertical Tracks are installed, it is time to seal up the sides of the Door, back to the Mounting Surface. Secure the top edge of the Side Seal to the Header Projection Brackets via the hook-and-loop strips (provided).
    • The Vinyl Critter Catchers are installed in the Vertical Track prior to shipment. Once the Vertical Tracks are installed, it is time to seal up the sides of the Door, back to the Mounting Surface.

    • Secure the top edge of the Side Seal to the Header Projection Brackets via the hook-and-loop strips (provided).

    • Pull the Material up and back to ensure it is Taut in all directions to close any Air Gaps that remain.

    • Fold the Side Seal Material to flatten it against the wall. Secure it through the Material into the Mounting Surface with appropriate Hardware.

Finish Line

Trent Borgardt

Member since: 03/01/2022

3,435 Reputation

54 Guides authored

Team

Engineering Team Member of Engineering Team

3 Members

80 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 45