  1. Assemble a Screen to
    • Assemble a Screen to

    • two Posts to create a Screen.

    • Install Feet to each Screen to create Standing Screens.

    • Install Bracing to tie the Standing Screens together.

  2. Lay the Posts on a flat surface.
    • Lay the Posts on a flat surface.

    • Unroll the Screen between the Posts with the Logo facing Up and at the Bottom.

    • From the Back Side, insert a Screw

    • through the Post

    • through the Screen Slot

    • through a Washer.

    • Secure the pack with a Lock Nut.

  3. The Post Bottom has 4 holes. The Bottom Hole is used for mounting the Foot, and is not used in this step.
    • The Post Bottom has 4 holes. The Bottom Hole is used for mounting the Foot, and is not used in this step.

    • At the Post Bottom, slide a Screw

    • through the Post

    • in a Hole that aligns with the Slot Bottom on the Screen.

    • Slide a Washer onto the Screw.

    • Secure the pack with a Lock Nut.

    • Repeat the process for the other Post.

  4. Orient the Foot to  the
    • Orient the Foot to the

    • "C" Bracket as shown.

    • Secure the 2 parts together with a Hex Screw creating the "Foot Assembly".

    • Slide the Foot Assembly into the Post Bottom. The "C" Bracket must be oriented as shown.

    • From the Back Side, insert a Screw

    • through the Post's Bottom Hole.

    • Secure the pack with a Lock Nut.

    • Repeat this process for the other Foot.

  5. Insert a Short Screw
    • Insert a Short Screw

    • through an Angle Brace Hole. (Orient the Brace as shown.)

    • through the Top Brace 2nd Hole.

    • Loosely Secure the pack with a Lock Nut.

    • Repeat on the other End of the Top Brace.

    • Repeat for the other Top Brace.

  6. Insert a Screw
    • Insert a Screw

    • through the Top Brace 1st/End Hole.

    • through the Post Top Hole.

    • Loosely Secure the pack with a Lock Nut.

    • Insert a Screw

    • through the other Angle Brace Hole.

    • through the Post 2nd Hole.

    • Loosely Secure the pack with a Lock Nut.

  7. Repeat the previous step on the other 3 Corners
    • Repeat the previous step on the other 3 Corners

    • Plumb and Square the Screens.

    • Fully tighten all of the Bracing Hardware.

Finish Line

Todd Lucas

Member since: 03/01/2022

13,056 Reputation

127 Guides authored

Team

Engineering Team Member of Engineering Team

3 Members

83 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 32